Our Projects
In Progress
Durbuy / Belgium
Production pumping construction
2 pumps ACH 100 m³/h at 235 mcE – Stanless steel piping 316L PN 40 DN 200/300
- Electromechanical systems
- Design office
- Design
- Pumping station.
![](/uploads/2020/01/011d1978-d22f-430d-9e80-3e7f90582ed2-567x465.jpg)
![](/uploads/2020/01/e3c95797-3ed4-42a8-b7ea-59fc84476572-567x465.jpg)
![](/uploads/2020/01/ec227ca1-a49d-4ffd-8d79-32deb786251f-567x465.jpg)
![](/uploads/2020/01/img-3565-567x465.jpg)
![](/uploads/2020/01/img-3566-567x465.jpg)
![](/uploads/2020/01/img-3567-567x465.jpg)
![](/uploads/2020/01/img-3568-567x465.jpg)
![](/uploads/2020/01/0001-567x465.jpg)
NSAWAM / GHANA
Nsawam Water Supply Rehabilitation and Expansion Project
4,500m Pipeline laying works and construction of a new Drinking Water Treatment Plant (7,200m3/d), including the construction of the intake to meet for the estimated water demand by the year 2025. Technical assistance and training.
- International service
- Pipeline laying
- Electromechanical installations
- Drinking Water treatment plant
- Design and engineering
![](/uploads/2018/09/image004-567x465.jpeg)
![](/uploads/2018/09/image003-567x465.jpeg)
![](/uploads/2018/09/image002-567x465.jpeg)
ITHANGA / KENYA
Projet d’amélioration de l’approvisionnement en eau d’Ithanga
Fournir 6 000 m3 /j d’approvisionnement en eau à Ithanga Aria, en plus du système d’approvisionnement existant de 1 200 m3/j. Assistance technique et renforcement des capacités.
- Prestations internationales
- Bureau d’études
- Réseau de distribution d’eau potable
- Usine de traitement d’eau potable
![](/uploads/2018/09/img-c4bfb43db2e050a95683f2a1dd5a3c77-v-567x465.jpg)
![](/uploads/2018/09/img-202a4354360b8cb11276ec88f2b622b0-v-567x465.jpg)
![](/uploads/2018/09/img-72efe2d259243ad1d9a756545a8e0c2f-v-567x465.jpg)
![](/uploads/2018/09/ithanga_cuve_en_beton.jpg)
![](/uploads/2018/09/ithanga_radier.jpg)
BEEZ / BELGIUM
Refurbishment of the Beez water treatment plant
Refurbishment of the Beez water treatment plant of Beez (4,000m3/h – 5 Sand Filters) – Refurbishment and reinforcement of Forge and Sapinière pumping stations (20m3/h).
- Electromechanical installations
- Engineering Office
- Design
- Pumping Station
![](/uploads/2018/09/beez-cave-avant-567x465.jpg)
![](/uploads/2018/09/beez-salle-filtres-avant-567x465.jpg)
![](/uploads/2018/09/after2a-567x465.jpg)
![](/uploads/2018/09/pompes-567x465.jpg)
![](/uploads/2018/09/tuyaux-567x465.jpg)